Project: Chapel Walls Phase 1

Previous repairs to the interior fabric of the chapel had seen the use of a sand and cement mixture, in localised patches, across the entire face of the North Wall.

The cementitious mortar was removed and the patches re-pointed in lime mortar, with the inclusion of stone pinnings and pieces of tile, to match the original and surrounding masonry.


Pause